Your cart is empty
Begin with one of our most-loved collections and find a piece made for you.
Shop best sellers- Made to order in Surat
- Insured international delivery
- Secure Shopify checkout
Added:
Cart Error
Drawer menu
Your cart (0)
Begin with one of our most-loved collections and find a piece made for you.
Shop best sellers
Here is how a made-to-order engagement ring is made: the diamond is chosen first, the design is modelled in CAD, the mount is cast in gold by the lost-wax method, then filed, set, polished, certified, checked and cleared through customs. Setting and customs clearance are the two stages most likely to add days. Three to six weeks is the usual trade range.
A made-to-order ring is one that does not exist as an object until somebody orders it. No stock, no shelf, no box waiting in a warehouse — only a specification, a stone and a bench. What follows is how that chain generally runs across the trade. Workshops differ, and anyone quoting an exact hour count per stage is guessing.
Because the mount is built around the stone, not the other way round. A setter cuts each seat with burrs sized to one diamond's diameter and depth. A head made for a 6.5 mm round will not quietly accept a 6.4 mm one — the stone sits low, the prongs bottom out.
Selection also flushes out risk early. Diamond is extremely hard and still not unbreakable: a very thin girdle, or an inclusion close to one, raises the odds of a chip under a setter's pressure. Better to know before gold has been cast around it. If you are choosing the stone yourself, our guide to choosing a diamond covers which grades change what you actually see on the finger.
CAD modelling turns a sketch into a measurable three-dimensional object before any metal is committed. On screen you check wall thickness, prong height, gallery clearance, whether a halo overhangs a narrow finger.
Plenty of designs look correct as drawings and fail as objects. Prongs too slim to survive polishing. A basket that traps soap. A shank that flexes in wear. Catching that in a file costs an hour; catching it in cast gold costs the casting. Once approved, the model is printed in castable resin or cut in wax.
The pattern is attached to sprues — short rods that become the channels the metal runs down — and assembled into a tree. That tree goes into a steel flask and is drowned in investment, a heat-resistant plaster that records every surface detail.
The flask then goes into a kiln, usually inverted, for burnout. Over a staged cycle running several hours the wax melts away completely, leaving a hollow cavity in the exact shape of the pattern. Rush the cycle and the mould cracks or fine detail is lost. The flask is held hot enough not to shock the incoming metal, the alloy is melted, and it is drawn into the cavity by gravity or vacuum. Exact temperatures are alloy-specific.
Then the flask is quenched. The plaster disintegrates, and out comes a rough casting that looks nothing like jewellery: grey, grainy, still on its sprues.
Porosity is voids in cast metal — pinholes on the surface, or a spongy patch beneath it — caused by gas trapped in the melt or by shrinkage as the metal solidifies. The usual contributors:
The awkward part is that porosity often stays invisible until polishing opens it up. A pinhole mid-shank can sometimes be dealt with. A pinhole under a prong cannot, and the piece is recast. Uncommon, but a real reason a ring slips a few days.
The unphotogenic part. Sprue stubs are cut and filed flush, surfaces worked through finer and finer abrasives, inside edges trued so the band feels round rather than merely measures round, and the piece pre-polished before any stone goes near it. You cannot lean into a surface a diamond sits in.
Setting is the stage that most often costs a day, sometimes two. Every seat is cut individually. Prongs are pushed over, then trimmed and rounded. On pavé, tiny beads are raised out of the metal itself and burnished over the girdles.
It is also the highest-risk moment. Setters break more stones than owners do, usually a thin girdle or a near-surface inclusion that was waiting to fail. If a stone does not pass inspection at the bench, it is replaced and the seat recut — there goes a day. A fully pavé shank takes longer than a plain solitaire, which is why two rings ordered the same morning do not finish the same afternoon.
White gold is yellow gold alloyed with pale metals, and it still carries a faint warm cast. Rhodium plating covers that with a hard, bright, hypoallergenic layer — on rings, typically around a micron. Thicker is not better: rhodium is brittle, and a heavy layer can craze. It is a wearing part — rings worn daily commonly want replating somewhere between a few months and a couple of years. Yellow and rose gold skip the step. Karat matters too, which our note on 9K, 14K and 18K gold goes into.
Independent grading happens to the stone, not the finished ring, in a separate queue at a separate building. That queue is measured in days rather than hours and moves with the laboratory's workload, which is why the stone goes off early. The report number is laser-inscribed on the girdle, and that inscription is what makes the paperwork verifiable years later: under a loupe you read the number off the stone and check it against the certificate. We covered the detail in what an IGI certificate actually tells you.
Final polish comes after setting, and it is fiddlier than it sounds — smaller tools, lighter pressure, no leaning in. Then the checks. Weight recorded. Size measured rather than assumed. Stones tested for movement, prongs examined under magnification, the girdle inscription read against the certificate. A ring that fails here goes back to the bench, and a sizing error caught this late costs more days than any other.
Export paperwork is where a surprising amount of avoidable delay lives. A commercial invoice for jewellery leaving India needs the exporter's IEC, a specific description covering metal, karat, weight and stone details, the correct HS classification, country of origin and the incoterm. Vague declarations — "gift", "sample", "merchandise" — attract a hold. Under DDP terms the seller pays the import duty and handles clearance, so nothing arrives with a bill attached. Customs can still pull any shipment for inspection, and no one can honestly promise otherwise.
Relative durations as the trade works — proportions, not promises.
| Stage | What happens | What can add time |
|---|---|---|
| Stone selection | Diamond chosen, measured, certificate checked | Preferred stone already sold; measurements that do not suit |
| Design & CAD | 3D model built, checked for thickness and fit | Revision rounds; any change after approval |
| Pattern | Printed in castable resin or cut in wax | A failed print; fine detail needing a retry |
| Casting | Sprue, invest, burnout, pour, quench, devest | Porosity or incomplete fill — the piece is recast |
| Filing & pre-polish | Sprues removed, surfaces trued, pre-polished | Heavy hand-work on an intricate gallery |
| Stone setting | Seats cut, prongs or beads worked, stones set one by one | A chipped stone; high pavé counts — most likely to run over |
| Final polish | Brought to finished lustre, cleaned | Rework if polishing reveals a flaw |
| Rhodium | Thin plating, white gold only | Not applicable to yellow or rose gold |
| Certification | Stone graded independently, report number laser-inscribed | The laboratory's own queue, which moves with its workload |
| QC & packing | Inscription matched to certificate, stones and finish checked | A sizing error here sends the ring back to the bench |
| Export & customs | Commercial invoice, HS code, origin, duty handled | Vague paperwork; inspection; public holidays at either end |
| Courier | Insured, tracked air freight | Weather, network backlog, a failed delivery |
Three to six weeks from order to delivery is the band jewellers most commonly quote, four to five weeks the figure you hear most from workshops that cast, set and finish under one roof. Holding your own certified stones compresses it, because most of the waiting in a long timeline is handover between separate businesses rather than work.
Bench work is measured in hours, queues in days, and the two things that most often move a delivery date are a resize and a customs inspection. Neither is exotic. A resize is the one you can avoid, which is why our note on finding her ring size without asking exists.
Everything we make is made to order at our own bench in Surat, in solid 9 to 18 karat gold — never plated, never vermeil. Every diamond is lab-grown and IGI-certified, with the report number inscribed on the girdle so you can check it yourself. We ship to the US, UK and Canada with import duties prepaid, roughly two weeks door to door. If you would rather look at finished work than read about process, that is what our engagement rings are for.
Three to six weeks from order to delivery is the usual range across the trade, and four to five weeks is the figure jewellers quote most often when casting, setting and finishing happen in one workshop. Splitting those stages between separate businesses adds handover time. Stone setting and customs clearance are the two stages most likely to push a date.
Porosity is small voids in cast metal — pinholes on the surface or a spongy area beneath it. It comes from gas trapped in molten metal, shrinkage as thick sections cool, contaminated scrap in the alloy, or quenching the flask too early. It often only shows up during polishing, and a pinhole under a prong means recasting the piece.
Usually, but it depends on the design. A plain or lightly detailed shank resizes readily. A ring with stones set all the way round, or with engraving or a very thin shank under the head, is much harder and sometimes cannot be resized safely at all. Getting the size right before casting avoids the whole question.
White gold is yellow gold alloyed with pale metals, so it carries a faint warm tone of its own. The bright white comes from rhodium plating, typically around a micron thick on a ring. That layer wears with daily contact and eventually thins, letting the alloy's natural colour show. Replating restores it.
It can. Most delays trace back to paperwork rather than the parcel — a vague description like "gift", a wrong HS code, or a missing origin declaration will attract a hold. Under DDP terms the seller pays import duty and handles clearance, so no bill lands with the delivery. Customs can still select any shipment for inspection.
It is different rather than automatically better. Made to order means the mount is built around your specific stone, with seats cut to its exact measurements and the ring sized correctly from the start. The trade-off is waiting a few weeks and having fewer opportunities to change your mind once casting begins.